Objects

    Liquidation of the Taldykol wastewater storage with land restoration in Astana (final stage). Phase II

    Read more
    Major overhaul of the sludge mechanical dehydration shop at the WWTF of Astana city (7th kilometer of Korgalzhyn highway)

    Read more
    Karaganda plant of complex alloys with the capacity of 175,000 tons per year, with the perspective of increasing to 600,000 tons per year



     

    Read more
    "Ecoton Asia" plant for the production of equipment for wastewater treatment

    Read more
    CHP-SBS. Water treatment complex with a capacity of 400 m³/h of a SPS. Boiler station for 5 boilers

    Read more
    Multidisciplinary clinical hospital for 300 beds with Karaganda State Medical University in Karaganda

    Read more
    Betbulak village, Ulytau district. Construction of a secondary school for 150 students

    Read more
    Adjustment of a working project for re-application in construction of a kindergarten for 320 spots in Karaganda (New city)

    Read more
    Adjustment of a working project for re-application in construction of a kindergarten for 320 spots in Karaganda (South-East)

    Read more
    Reconstruction of a tenement house No. 1a in the block No. 4 of Temirtau

    Read more
    Completion of the building construction with reconstruction for polyclinic No. 1 in Karaganda

    Read more
    Construction of a secondary school for 150 students. Tersakkan village, Ulytau district

    Read more
    Construction of a kindergarten for 320 spots. Temirtau, 9th microdistrict.

    Read more
    Construction of a boiler house in Saran

    Read more
    Reconstruction of the existing pump-filtering station with a capacity of 200,000 m³ per day in Astana

    Read more
    Reconstruction of WPS-5 to increase the supply of water through the Astrakhan-Mangyshlak water pipeline

    Read more
Наверх